We implement a full-process quality control system from raw material sourcing to final delivery, strictly adhering to the "Three Zero Principles: Zero acceptance of defects, Zero production of defects, Zero delivery of defects". Certified by ISO9001 Quality Management System with 200+ critical quality control points, we maintain consistent product qualification rate above 99.98%.
"Building quality barriers for new challenges" – Zero defects as our ultimate goal
Through lean production systems and value stream optimization, we achieve 45% higher productivity per capita and 60% shorter delivery cycles. Our unique efficiency model integrates three pillars:
500+ positions equipped with visual work instructions eliminating operational variations
IoT-enabled real-time production monitoring with dynamic rhythm control
2.6 annual improvement ideas per employee saving 12,000+ man-hours yearly
Metric | Industry Avg. | Our Level |
---|---|---|
Overall Equipment Effectiveness (OEE) | 76% | 94% |
Inventory Turnover | 8x/year | 15x/year |
Line Changeover Time | 120 min | 28 min |
"Memory alone fails, standardized work prevails" – Efficiency in our DNA